Building Permit Requirements in Belize


Posted Sept. 13th at 0800

Property For Rent

Waterfront Cottage

$200/Week - $650/Month

Waterfront Studio

$200/Week - $700/Month

Two Apartments For Rent
In Consejo Village

$150/Week - $550/Month

$200/Week - $650/Month

Iguana's Nest Cottage
In Consejo Village

$200/Week - $650/Month
Plus Utilities

Room For Rent
In Consejo Village

$125/Week - $400/Month
Plus Utilities

Casita On Pelican Pathway
In Consejo shores

$225/week - $700/month
Plus Utilities

Water View 3 Br
In Consejo shores

$800/month + Utilities

House For Rent
In Consejo Shores

$750/Month
Plus Utilities

All Real EstatePrices
in are US Dollars


Building Permit Requirements in Belize

Vance C. Titus, P.Eng./APEB, P.Arch./APAB

If you want to build a structure of whatever kind of a residence, apartment building, resort and tourist facilities, commercial and institutional and industrial buildings, agricultural structures, a pier and other over-water structures, detached out buildings, and moveable buildings, to name a few building types of whether temporary or permanent, the building owner is required to secure a building permit before construction starts. If you want to add-on to, remodel, or renovate an existing structure the building owner is required to secure a building permit before construction starts. The primary authority for the review and approval of building plans and issuing building permits is:

  • Central Building Authority
  • 3rd Floor, Coastal Zone Management Building
  • Princess Margaret Drive
  • Belize City, Belize
  • Tel.: 223-2616; Fax.: 223-5738
  • E-mail: centralbuildingauthority@yahoo.com
  • Paul Satchwell, P.Eng., Director

The Central Building Authority has delegated the responsibilities to review and approve building plans and issue building and occupancy permits, in their respective jurisdictions, to the Local Building Authorities in Belize City, the City of Belmopan, and in each of the Towns constituted under the Town Councils Act. Depending on the nature of the building project other governmental agencies may also be involved in the overall permitting process.

The "Belize Building Act, 2003" (the "Act") was Gazetted on 1st February 2003. The Act was approved by the House of Representatives and the Senate of Belize to control building operations in the interest of public health and safety and to enable the introduction of regulations prescribing standards relating to the use of material and methods of construction,…” The provisions of the Act apply to the construction of any building or structure in Belize.

The Act establishes the Central Building Authority (the Authority) to administer the provisions of the Act. The Authority shall appoint a professional engineer or architect to be the Director of Building Control (the Director). The Director shall sign and issue all building permits, enforcement notices and other related documents. The Authority may appoint Building Inspectors to review plans and other documentation submitted in support of an application for a building permit, and inspect construction to determine compliance with the terms of the building permit.

Any person who proposes to construct a building shall submit to the Authority an application for a permit to build. Every application for a permit to build shall be made in writing and shall be accompanied by such drawings, descriptions, calculations and specifications as the Authority or the Director may require. The Director shall reply to the applicant by either issuing a permit or rejecting the Application. If an Application is rejected a letter shall be issued identifying the items in the Application and attached documents that need to be clarified, strengthened or added in order for the Application to be approved. A permit for the construction of a building shall be granted when the Director is satisfied that the operation involved will be conducted in accordance with building regulations. Within seven (7) days following the completion of construction of any building, the building owner shall submit written notice to the Director stating the date of completion and applying for permission to occupy and use the building.

Central Building Authority: Application For Review

The Central Building Authority Application for Review (Application) is a standardized form which, in general, is a written description of the building project for which the building permit is being applied. As mandated by the Act, every Application shall be accompanied by such drawings, descriptions, calculations and specifications as the Authority or the Director may require. The identifies the following drawings to be included with the Application:

  1. Site Plan showing property boundaries, adjoining and adjacent roads, easements, alleys and footpaths, the position and nature of all electric power supply lines, the location and size of all water supply and waste disposal lines, and the position of existing and any proposed building or buildings and parking area(s) on the same lot.
  2. Floor Plan for each floor of the building(s), including basement or foundation, mezzanines and roof.
  3. Elevations for each face of the building(s), showing relative heights.
  4. Cross divs (2 minimum) through the building(s) including foundation. Cross divs should indicate building materials and relative heights throughout the building, including the roof.
  5. Electrical (PUC Approved) and plumbing schematic drawings and basic specifications including septic tank, soak-a-way, etc. Note: The Authority requires that the electrical drawings and related documentation must receive approval from the Public Utilities Commission (PUC) before submitting such drawings and related documents to the Authority.
  6. Structural engineering drawings and basic specifications of building(s) and water retaining structures, where applicable.

The Authority recommends that four (4) complete sets of the above described plans, drawings, specifications and other data and documentation should be submitted to the Authority with each Application. Once approved, one set of the approved documents shall be retained by the Authority; one set is to be retained by the owner; one set is to be retained by the architect and/or engineer; and one set is to be kept at all times at the construction site.

The plans, drawings and other construction documents for buildings less than one thousand (1,000) square feet and not more than one story high do not require the signature of an architect or engineer. However, depending upon the complexity and use of the building, the Authority reserves the right to require that the plans and specification for certain building less than one thousand (1,000) square feet be prepared, designed, stamped and signed by an a registered professional architect and/or civil or structural engineer licensed to practice in Belize. The Authority requires that plans and specifications for buildings between one thousand (1,000) square feet and three thousand (3,000) square feet and up to two stories should be prepared, designed, stamped and signed by either a registered professional architect or civil or structural engineer licensed to practice in Belize. The Authority requires that plans and specifications for buildings over three thousand (3,000) square feet and/or more than two (2) stories should be prepared, designed, stamped and signed by both a registered professional architect and a civil or structural engineer licensed to practice in Belize.




Consejo.Bz responds: First, I want to thank Vance Titus for providing this information. He has taken some heat for what has been presented in some of the articles in this series, some of that heat from me. The information he has taken the time to provide us is important for people planning on building in Belize to understand. The requirements laid out in this article are the new reality for home builders in Belize. So we shall not shoot the messenger.

This act has been in effect since 2003? I built 2 house in Consejo Shores since that time with no mention by anyone of any of this foolishness. I wonder if those houses, or any of the multitude of homes built since 2003, or 1973 for that matter, would be safer today, or have cost less to build, or not been further delayed in completion had these rules been then enforced. Of course not, which brings up the question: what is the point of this needless regulation? Read my thoughts about it here: The Gringo-fication of Belize.

Oh, and does anyone else think it is a little hinky that the "Central Building Authority Of Belize" has a Yahoo! email address?

 